Pulsometer on bracelet for Sunday. Will be linesman at my sons football match, so can time the halves and also take my no doubt raised pulse rate at half time !
The current project taking most of my time is for a major oil company. We are building a portion of it in Maine and it will be sent by barge (19 loads) to the site in PA. We signed "sail away papers" for the first load yesterday. The site: Our first load (3 modules to be field erected) to depart after some nasty weather on Monday. 57 more modules to go. Edited to delete photo. I thought I had it configured to eliminate detail, but when I clicked on it, I was able to get too much detail for comfort. Sorry. Normally we would have a 100' x 400' barge fully loaded with modules as high as 80' or 90' tall. However these barges have to go up the Mississippi and Ohio, where bridge clearance limits the height. The project schedule will be met with this delivery plan. Almost forgot today's watch: